CHILL Newsletter 2007: Difference between revisions
From CSU-CHILL
Pat kennedy (talk | contribs) No edit summary |
m (Changed operations summary link to point to the right one) |
||
Line 25: | Line 25: | ||
| valign=top | [[Image:Nlet band 600.png|150px]] | | valign=top | [[Image:Nlet band 600.png|150px]] | ||
| valign=top | | | valign=top | | ||
;[[Radar Operations Summary]] | ;[[Radar Operations Summary (2006-2007)]] | ||
:The in house designed digital receiver / signal processing systems used in the CSU-CHILL and Pawnee radars continued to be tested and refined during 2007. (They were initially fielded on both radars during the summer of 2006). CSU-CHILL operations were suspended in July 2007 to prepare the Greeley radar site for the installation of the new dual offset feed antenna. | :The in house designed digital receiver / signal processing systems used in the CSU-CHILL and Pawnee radars continued to be tested and refined during 2007. (They were initially fielded on both radars during the summer of 2006). CSU-CHILL operations were suspended in July 2007 to prepare the Greeley radar site for the installation of the new dual offset feed antenna. | ||
|- | |- |
Latest revision as of 01:20, 2 December 2008
This is the CHILL newsletter for January 2007 through July 2008.
| |
| |
| |
| |
|