12 February 2008
- 11:5011:50, 12 February 2008 diff hist +134 m CSU CHILL Added links under web services for the Scan Optimizer and the Radome Log info
2 January 2008
- 17:2417:24, 2 January 2008 diff hist +4 Current Events No edit summary
- 17:2217:22, 2 January 2008 diff hist +44 N June 1, 2007 Site Preparation June 1, 2007 Site Preparation moved to Site Preparation, June 1, 2007: To get more meaningfull archive tags. LIst subject first, date second. current
- 17:2217:22, 2 January 2008 diff hist 0 m Site Preparation, June 1, 2007 June 1, 2007 Site Preparation moved to Site Preparation, June 1, 2007: To get more meaningfull archive tags. LIst subject first, date second.
- 17:2217:22, 2 January 2008 diff hist +80 N July 6, 2007 Pouring a new foundation for the pedestal and radome July 6, 2007 Pouring a new foundation for the pedestal and radome moved to Pouring a new foundation for the pedestal and radome, July 6, 2007: To get more meaningfull archive tags. LIst subject first, date second. current
- 17:2217:22, 2 January 2008 diff hist 0 m Pouring a new foundation for the pedestal and radome, July 6, 2007 July 6, 2007 Pouring a new foundation for the pedestal and radome moved to Pouring a new foundation for the pedestal and radome, July 6, 2007: To get more meaningfull archive tags. LIst subject first, date second.
- 17:2117:21, 2 January 2008 diff hist +44 N Aug 3, 2007 RF Instrument Lab Aug 3, 2007 RF Instrument Lab moved to RF Instrument Lab, Aug 3, 2007: To get more meaningfull archive tags. LIst subject first, date second. current
- 17:2117:21, 2 January 2008 diff hist 0 m RF Instrument Lab, Aug 3, 2007 Aug 3, 2007 RF Instrument Lab moved to RF Instrument Lab, Aug 3, 2007: To get more meaningfull archive tags. LIst subject first, date second.
- 17:2017:20, 2 January 2008 diff hist +41 N Aug 16, 2007 Pedestal Work Aug 16, 2007 Pedestal Work moved to Pedestal Work, Aug 16, 2007: To get more meaningfull archive tags. LIst subject first, date second. current
- 17:2017:20, 2 January 2008 diff hist 0 m Pedestal Work, Aug 16, 2007 Aug 16, 2007 Pedestal Work moved to Pedestal Work, Aug 16, 2007: To get more meaningfull archive tags. LIst subject first, date second.
- 17:1917:19, 2 January 2008 diff hist +55 N Dec 20, 2007 Antenna Installation Part 1 Dec 20, 2007 Antenna Installation Part 1 moved to Antenna Installation Part 1, Dec 20, 2007: To get more relevant archive tags put subject first, date second. current
- 17:1917:19, 2 January 2008 diff hist 0 m Antenna Installation Part 1, Dec 20, 2007 Dec 20, 2007 Antenna Installation Part 1 moved to Antenna Installation Part 1, Dec 20, 2007: To get more relevant archive tags put subject first, date second.
- 15:4415:44, 2 January 2008 diff hist +1 m Current Events No edit summary
- 15:4215:42, 2 January 2008 diff hist −1 Antenna Installation Part 1, Dec 20, 2007 No edit summary
- 15:4115:41, 2 January 2008 diff hist +474 N Site Preparation, June 1, 2007 New page: The summer of 2007 is noteworthy for the CSU-CHILL Facility in that we are experiencing the culmination of years of work and planning for the new dual-offset feed antenna. Although this s...
- 15:4015:40, 2 January 2008 diff hist −326 Current Events No edit summary
- 15:3615:36, 2 January 2008 diff hist +1,853 N Pedestal Work, Aug 16, 2007 New page: Operations were suspended at the end of June to allow for replacement of the main azimuth bearing. The pedestal is a big heavy item (24,000 lbs) which requires a certain amount of heavy l...
- 15:3615:36, 2 January 2008 diff hist −2,804 Current Events No edit summary
- 15:3115:31, 2 January 2008 diff hist +2,501 N Antenna Installation Part 1, Dec 20, 2007 New page: At last the site preparations are nearly complete and the pedestal was also ready to be fitted with the new antenna. Kyle Hollwarth, the mechanical designer of the antenna, and a two-man ...
- 15:3015:30, 2 January 2008 diff hist +40 N File:Replace-panels.jpg Panels are bolted in from the rear face. current
- 15:3015:30, 2 January 2008 diff hist +47 N File:Step1-complete2.jpg Antenna in near zero degree elevation position. current
- 15:2915:29, 2 January 2008 diff hist +46 N File:Step1-complete.jpg Completion of first stage of antenna assembly. current
- 15:2815:28, 2 January 2008 diff hist +27 N File:Dish-install2.jpg Dish is bolted to sidearms. current
- 15:2715:27, 2 January 2008 diff hist +45 N File:Dish-install1.jpg Nearly complete antenna is lifted into place. current
- 15:2715:27, 2 January 2008 diff hist +39 N File:Replace-panels2.jpg Replacing panels into backup structure. current
- 15:2615:26, 2 January 2008 diff hist +61 N File:Install-boom.jpg The feed boom is lifted into place and bolted to the antenna. current
- 15:2515:25, 2 January 2008 diff hist +68 N File:Assemble-pieces2.jpg The two side reflector pieces are bolted to the center dish section. current
- 15:2415:24, 2 January 2008 diff hist +57 N File:Assembly-overview1.jpg The major antenna pieces on the ground awaiting assembly. current
- 15:2215:22, 2 January 2008 diff hist +40 N File:Moving-boom.jpg The feed-boom is lifted off the trailer. current
- 15:2115:21, 2 January 2008 diff hist +116 N File:Finished-counterweight.jpg The modified counterweight is now on the pedestal and the cross-member connecting the two sidearms has been mounted. current
- 15:1915:19, 2 January 2008 diff hist +68 N File:Sidearm-mod.jpg Sidearm extension structure is now bolted onto the original sidearm. current
- 15:1615:16, 2 January 2008 diff hist +89 N File:Hole-transfer.jpg Old mounting plate is used as a template for drilling holes in the new sidearm extension. current
- 15:1515:15, 2 January 2008 diff hist +102 N File:Mounting-plate.jpg View of the transfer of mounting holes from the original 3' square plate to the new sidearm extnsions. current
27 December 2007
- 19:3119:31, 27 December 2007 diff hist +3,207 Current Events No edit summary
26 October 2007
- 16:5016:50, 26 October 2007 diff hist +53 m CSU CHILL Added link to elog
20 September 2007
9 July 2007
- 16:4016:40, 9 July 2007 diff hist +1 Pouring a new foundation for the pedestal and radome, July 6, 2007 No edit summary
- 16:3716:37, 9 July 2007 diff hist +62 N File:Leveler-pumper.jpg View of laser leveler source with concrete pump in background. current
- 16:3716:37, 9 July 2007 diff hist +57 N File:Ring-finishing.jpg Leveling and finishing process on radome ring foundation. current
- 16:3616:36, 9 July 2007 diff hist +73 N File:Pumping.jpg Filling the radome foundation forms with remote controlled concrete pump. current
- 16:3516:35, 9 July 2007 diff hist +94 N File:Pour07a.jpg Looking to the southwest with new foundation forms in foreground and old radome in background. current
- 16:3416:34, 9 July 2007 diff hist +67 N File:Ped-rebar.jpg Antenna pedestal foundation reinforcement before the concrete pour. current
- 16:3316:33, 9 July 2007 diff hist +78 N File:Inflation-duct.jpg One of three inflation ducts as seen before backfilling the radome foundation. current
- 16:3216:32, 9 July 2007 diff hist −17 File:Overview2.jpg No edit summary current
- 16:3016:30, 9 July 2007 diff hist +93 N File:Overview2.jpg Looking to the southwest with new foundation forms in forground and old radome in background.
- 16:2816:28, 9 July 2007 diff hist +38 N File:Ring-rebar.jpg Radome ring reinforcement before pour. current
- 16:2716:27, 9 July 2007 diff hist +52 N File:Overview.jpg View to the southeast showing new radome ring forms. current
- 16:1716:17, 9 July 2007 diff hist +1,017 N Pouring a new foundation for the pedestal and radome, July 6, 2007 New page: A relentless stream of ready-mix trucks kept the concrete pumper busy most of the day. <gallery> Image:overview.jpg|The pedestal foundation is surrounded by the 100 foot diameter radome t...
- 15:5315:53, 9 July 2007 diff hist +756 N Current Events New page: ==Current Events== The summer of 2007 is noteworthy for the CSU-CHILL Facility in that we are experiencing the culmination of years of work and planning on the new dual-offset feed antenna...
- 15:2815:28, 9 July 2007 diff hist +59 Contacts →People