- Radome Inflation Day Feb 19, 2008
- After waiting a few weeks for a 2 day window of good weather the new Bird-Air radome is installed.
- Antenna Installation Part 1, Dec 20, 2007
- The pedestal has been put up on the new foundation. The sidearm-counterweight modifications are complete and the antenna has been installed on the pedestal.
- Pedestal Work, Aug 16, 2007
- The installation of the new dual-offset antenna was delayed several months to allow for some necessary pedestal refurbishment.
- RF Instrument Lab, Aug 3, 2007
- A new dedicated RF instrument laboratory room was created at the CHILL facility, sporting some of the latest test equipment from Agilent and Tektronix.
- Pouring a new foundation for the pedestal and radome, July 6, 2007
- The new radome required a larger setback from the site boundaries. Consequently, the site was expanded to the east, and a new foundation was prepared just to the northeast of the previous radar location.
(more)
Recent Changes
An automatically generated list of recent changes to the CSU-CHILL website is available here