Pouring a new foundation for the pedestal and radome, July 6, 2007: Difference between revisions
No edit summary |
(Added to Current Events category) |
||
Line 10: | Line 10: | ||
Image:ring-finishing.jpg|Top of radome ring is finised by hand while the level is check by a laser detector. | Image:ring-finishing.jpg|Top of radome ring is finised by hand while the level is check by a laser detector. | ||
Image:leveler-pumper.jpg|Laser leveler (in forground) provides a height reference for finishing the concrete. | Image:leveler-pumper.jpg|Laser leveler (in forground) provides a height reference for finishing the concrete. | ||
</gallery> | |||
[[Category:Current Events]] |
Revision as of 13:05, 10 July 2007
A relentless stream of ready-mix trucks kept the concrete pumper busy most of the day.
-
The pedestal foundation is surrounded by the 100 foot diameter radome tie-down ring.
-
Forms and reinforcement structure for the grade beam which will support the radome.
-
Concrete pump slowly fills the ring, while workers finish the central pad.
-
One of the three inflation ducts which route air from the blowers into the radome.
-
Heavily reinforced central pedestal foundation contains pedestal bolt cage.
-
Pumping crane and new construction appear to dwarf the current radome.
-
Pump operator uses a wireless remote to guide the concrete output tube into the forms.
-
Top of radome ring is finised by hand while the level is check by a laser detector.
-
Laser leveler (in forground) provides a height reference for finishing the concrete.