Current Events

From CSU-CHILL

Revision as of 16:35, 6 July 2012 by Jgeorge (talk | contribs) (Added note about dual wavelength ops)

Current Events

Dual wavelength operations resume (July 5, 2012)

Dual wavelength (S- and X-band) operations have resumed after the completion of the DC3 project.

Deep Convective Clouds and Chemistry (DC3) Field Campaign (May 1 - June 30, 2012)

CSU-CHILL will be taking part in the Deep Convective Clouds and Chemistry (DC3) Field Campaign from May 1 to June 30. The events calendar will be updated to indicate specific data collection days.

Dual frequency Operations: January 2012

X-band test data

The Dual-frequency feed horn was installed on the CSU-CHILL antenna, and initial data collections were conducted to test the installation. Data from the X-band system is compared against the S-band system here.

Dual frequency feed horn arrives at CHILL: October 5, 2011

Dual frequency feed horn

The new feed horn capable of simultaneous polarimetric operations at S and X-bands was delivered in early October. Test operations with this horn should begin in December, 2011.

DOW radar data evaluations: August 26, 2011

DOW 7 at CSU-CHILL

Coordinated dual-polarization data collection was done by the DOW 7 and CSU-CHILL radars during the conduct of a 20hr project.

Recent Changes

An automatically generated list of recent changes to the CSU-CHILL website is available here