Current Events

From CSU-CHILL

Revision as of 17:00, 6 November 2008 by Pat kennedy (talk | contribs) (Added the "Initial N-Pol Operations at the CHILL" article link)

Current Events

Initial N-Pol Operations at the CHILL
A presentation of the initial installation of the NASA N-Pol radar at CHILL.
CSU-CHILL Open House: Oct 3, 2008
Summary of an Open House held for students and faculty of the CSU Electrical and Computer Engineering department.
Live video feed Jul 21, 2008
The CHILL site now has a web-viewable live video feed
Radome Inflation Day Feb 19, 2008
After waiting a few weeks for a 2 day window of good weather the new Bird-Air radome is installed.
Antenna Installation Part 1, Dec 20, 2007
The pedestal has been put up on the new foundation. The sidearm-counterweight modifications are complete and the antenna has been installed on the pedestal.

Recent Changes

An automatically generated list of recent changes to the CSU-CHILL website is available here