Current Events: Difference between revisions
(Added DC3 link) |
(Added note about dual wavelength ops) |
||
Line 2: | Line 2: | ||
<!-- Note to editors: articles should be in reverse chronological order. --> | <!-- Note to editors: articles should be in reverse chronological order. --> | ||
===Dual wavelength operations resume (July 5, 2012)=== | |||
Dual wavelength (S- and X-band) operations have resumed after the completion of the DC3 project. | |||
===Deep Convective Clouds and Chemistry (DC3) Field Campaign (May 1 - June 30, 2012)=== | ===Deep Convective Clouds and Chemistry (DC3) Field Campaign (May 1 - June 30, 2012)=== | ||
Line 17: | Line 20: | ||
[[Image:DOW 7 26aug2011.JPG|center|thumb|300px|DOW 7 at CSU-CHILL]] | [[Image:DOW 7 26aug2011.JPG|center|thumb|300px|DOW 7 at CSU-CHILL]] | ||
Coordinated dual-polarization data collection was done by the DOW 7 and CSU-CHILL radars during the conduct of a 20hr project. | Coordinated dual-polarization data collection was done by the DOW 7 and CSU-CHILL radars during the conduct of a 20hr project. | ||
<div align="right">([[:Category:Current_Events|more]])</div> | <div align="right">([[:Category:Current_Events|more]])</div> |
Revision as of 16:35, 6 July 2012
Current Events
Dual wavelength operations resume (July 5, 2012)
Dual wavelength (S- and X-band) operations have resumed after the completion of the DC3 project.
Deep Convective Clouds and Chemistry (DC3) Field Campaign (May 1 - June 30, 2012)
CSU-CHILL will be taking part in the Deep Convective Clouds and Chemistry (DC3) Field Campaign from May 1 to June 30. The events calendar will be updated to indicate specific data collection days.
Dual frequency Operations: January 2012
The Dual-frequency feed horn was installed on the CSU-CHILL antenna, and initial data collections were conducted to test the installation. Data from the X-band system is compared against the S-band system here.
Dual frequency feed horn arrives at CHILL: October 5, 2011
The new feed horn capable of simultaneous polarimetric operations at S and X-bands was delivered in early October. Test operations with this horn should begin in December, 2011.
DOW radar data evaluations: August 26, 2011
Coordinated dual-polarization data collection was done by the DOW 7 and CSU-CHILL radars during the conduct of a 20hr project.
Recent Changes
An automatically generated list of recent changes to the CSU-CHILL website is available here