===Dual frequency Operations: January 2011=== | |||
[[Image:11jan2012 X v rhi anot.png|center|thumb|300px|X-band test data]] | |||
The Dual-frequency feed horn was installed on the CSU-CHILL antenna, and initial data collections were conducted to test the installation. Data from the X-band system is compared against the S-band system [[Initial CSU-CHILL X-band operations: January 2012|here]]. | |||
===Dual frequency feed horn arrives at CHILL: October 5, 2011=== | ===Dual frequency feed horn arrives at CHILL: October 5, 2011=== | ||
Line 27: | Line 31: | ||
[[Image:REU2011 sphere cal.JPG|center|thumb|300px|Monitoring a sphere flight from the CSU-CHILL user van]] | [[Image:REU2011 sphere cal.JPG|center|thumb|300px|Monitoring a sphere flight from the CSU-CHILL user van]] | ||
REU2011 students participating in a radar calibration experiment. | REU2011 students participating in a radar calibration experiment. | ||
<div align="right">([[:Category:Current_Events|more]])</div> | <div align="right">([[:Category:Current_Events|more]])</div> |
Revision as of 15:44, 2 February 2012
Current Events
Dual frequency Operations: January 2011
The Dual-frequency feed horn was installed on the CSU-CHILL antenna, and initial data collections were conducted to test the installation. Data from the X-band system is compared against the S-band system here.
Dual frequency feed horn arrives at CHILL: October 5, 2011
The new feed horn capable of simultaneous polarimetric operations at S and X-bands was delivered in early October. Test operations with this horn should begin in December, 2011.
DOW radar data evaluations: August 26, 2011
Coordinated dual-polarization data collection was done by the DOW 7 and CSU-CHILL radars during the conduct of a 20hr project.
Website Improvements
Several new features added:
- Projects list
- Radar status page
- Radar status indicator on front page
- Quick-look Real-time images
REU 2011 students: July 14, 2011
REU2011 students participating in a radar calibration experiment.
(more)