Current Events: Difference between revisions

From CSU-CHILL

No edit summary
(Added tornado article)
Line 1: Line 1:
==Current Events==
==Current Events==
 
;[[Tornado Observation from May 22, 2008]]
:Observations by CSU-CHILL of a nearby tornado


;[[Radome Inflation Day Feb 19, 2008]]
;[[Radome Inflation Day Feb 19, 2008]]
Line 13: Line 14:
;[[RF Instrument Lab, Aug 3, 2007]]
;[[RF Instrument Lab, Aug 3, 2007]]
:A new dedicated RF instrument laboratory room was created at the CHILL facility, sporting some of the latest test equipment from Agilent and Tektronix.
:A new dedicated RF instrument laboratory room was created at the CHILL facility, sporting some of the latest test equipment from Agilent and Tektronix.
;[[Pouring a new foundation for the pedestal and radome, July 6, 2007]]
:The new radome required a larger setback from the site boundaries.  Consequently, the site was expanded to the east, and a new foundation was prepared just to the northeast of the previous radar location.


<div align="right">([[:Category:Current_Events|more]])</div>
<div align="right">([[:Category:Current_Events|more]])</div>

Revision as of 15:23, 27 May 2008

Current Events

Tornado Observation from May 22, 2008
Observations by CSU-CHILL of a nearby tornado
Radome Inflation Day Feb 19, 2008
After waiting a few weeks for a 2 day window of good weather the new Bird-Air radome is installed.
Antenna Installation Part 1, Dec 20, 2007
The pedestal has been put up on the new foundation. The sidearm-counterweight modifications are complete and the antenna has been installed on the pedestal.
Pedestal Work, Aug 16, 2007
The installation of the new dual-offset antenna was delayed several months to allow for some necessary pedestal refurbishment.
RF Instrument Lab, Aug 3, 2007
A new dedicated RF instrument laboratory room was created at the CHILL facility, sporting some of the latest test equipment from Agilent and Tektronix.

Recent Changes

An automatically generated list of recent changes to the CSU-CHILL website is available here