WXlog/20171221 Snowband: Difference between revisions
Pat kennedy (talk | contribs) (Created page with "==Projects== Yuter 20 hr ==Data Recording Period== 21 Dec 2017 0718:24 UTC to 21 Dec 2017 1820:06 UTC X-band also operating ==Summary== Operation to test proposed Prof. Sand...") |
Pat kennedy (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
==Projects== | ==Projects== | ||
Yuter 20 hr | S. Yuter 20 hr | ||
==Data Recording Period== | ==Data Recording Period== | ||
21 Dec 2017 0718:24 UTC to | 21 Dec 2017 0718:24 UTC to | ||
Line 15: | Line 15: | ||
[[Image:21dec2017 1731 rhi z.png]] | [[Image:21dec2017 1731 rhi z.png]] | ||
[[Category:Snowband]] | |||
[[Category:Generating Cell]] |
Latest revision as of 07:06, 10 March 2018
Projects
S. Yuter 20 hr
Data Recording Period
21 Dec 2017 0718:24 UTC to
21 Dec 2017 1820:06 UTC
X-band also operating
Summary
Operation to test proposed Prof. Sandra Yuter project scanning procedures when snow was forecast during the local sunrise time period. The tested scan procedures consisted primarily of paired RHI volume; one group oriented into the mean 500 mb wind direction, and the second group on a perpendicular / cross-flow direction. During the initial part of the operation, a developing area of snow approached the radar from the northwest. By the end of the operating period, the strongest echoes had moved to the southeast of the radar and organized into multiple bands. RHI's through this southeast area showed well-developed precipitation streamers. Note: an antenna control system fault caused a data recording outage between 1404 and 1634 UTC.