Current Events: Difference between revisions

From CSU-CHILL

m (Added Users' Workshop stuff)
No edit summary
Line 8: Line 8:
;[[Distributed Version Control system]]
;[[Distributed Version Control system]]
:The current version control system used on CHILL, cvs, will be going away soon. This will be replaced by the Git system.
:The current version control system used on CHILL, cvs, will be going away soon. This will be replaced by the Git system.
;Phone system installation (Feb 5, 2009)
:The telephone PBX system at the CHILL site was upgraded to using a VoIP system. The [[Contacts]] page now lists the individual extensions of the CHILL staff members.
;[[Initial N-Pol Operations at the CHILL]]
:A presentation of the initial installation of the NASA N-Pol radar at CHILL.
;[[CSU-CHILL Open House: Oct 3, 2008]]
:Summary of an Open House held for students and faculty of the CSU Electrical and Computer Engineering department.


<div align="right">([[:Category:Current_Events|more]])</div>
<div align="right">([[:Category:Current_Events|more]])</div>

Revision as of 07:00, 1 July 2010

Current Events

NSF Users' Workshop: Jun 15-17, 2009
The CSU-CHILL Facility will be represented at the NSF Users' Workshop with a poster and a live demonstration of remote radar operation.
CSU-CHILL Open House: Jun 14, 2009
The CHILL Facility will be hosting an open-house event in support of the NSF Users' Workshop, conducted at NCAR.
Distributed Version Control system
The current version control system used on CHILL, cvs, will be going away soon. This will be replaced by the Git system.

Recent Changes

An automatically generated list of recent changes to the CSU-CHILL website is available here