Current Events: Difference between revisions
From CSU-CHILL
m (Added info about PBX) |
m (Added lab link) |
||
Line 1: | Line 1: | ||
==Current Events== | ==Current Events== | ||
;[[RF Instrument Lab]] Update (March 2, 2008) | |||
:The CHILL RF lab now has two new work benches, with power outlets, Ethernet connectivity and dedicated lighting. | |||
;Phone system installation (Feb 5, 2008) | ;Phone system installation (Feb 5, 2008) | ||
:The telephone PBX system at the CHILL site was upgraded to using a VoIP system. The [[Contacts]] page now lists the individual extensions of the CHILL staff members. | :The telephone PBX system at the CHILL site was upgraded to using a VoIP system. The [[Contacts]] page now lists the individual extensions of the CHILL staff members. |
Revision as of 13:43, 8 March 2009
Current Events
- RF Instrument Lab Update (March 2, 2008)
- The CHILL RF lab now has two new work benches, with power outlets, Ethernet connectivity and dedicated lighting.
- Phone system installation (Feb 5, 2008)
- The telephone PBX system at the CHILL site was upgraded to using a VoIP system. The Contacts page now lists the individual extensions of the CHILL staff members.
- Distributed Version Control system
- The current version control system used on CHILL, cvs, will be going away soon. This will be replaced by the Git system.
- Initial N-Pol Operations at the CHILL
- A presentation of the initial installation of the NASA N-Pol radar at CHILL.
- CSU-CHILL Open House: Oct 3, 2008
- Summary of an Open House held for students and faculty of the CSU Electrical and Computer Engineering department.
- Live video feed Jul 21, 2008
- The CHILL site now has a web-viewable live video feed
(more)
Recent Changes
An automatically generated list of recent changes to the CSU-CHILL website is available here