CSU-CHILL Projects and Deployments: Difference between revisions
From CSU-CHILL
Pat kennedy (talk | contribs) No edit summary |
Pat kennedy (talk | contribs) (Completed NSF projects shown in red for NSF 28 Jan 2014 site visit) |
||
Line 60: | Line 60: | ||
|S. Ellis | |S. Ellis | ||
|NCAR | |NCAR | ||
| | |20-hour | ||
|- | |- | ||
|FRONT Rainfall and Streamflow Prediction Tests | |FRONT Rainfall and Streamflow Prediction Tests | ||
Line 78: | Line 78: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|Unmanned Aircraft System Test | |Unmanned Aircraft System Test | ||
Line 96: | Line 96: | ||
|M. Kumjian and R. Rasmussen | |M. Kumjian and R. Rasmussen | ||
|NCAR | |NCAR | ||
|20-hour | |20-hour | ||
|- | |- | ||
|{{ProjectsYearSep}} colspan="5" align="center"|'''2012''' | |{{ProjectsYearSep}} colspan="5" align="center"|'''2012''' | ||
Line 104: | Line 104: | ||
|W. Krajewski | |W. Krajewski | ||
|University of Iowa | |University of Iowa | ||
|20-hour | |20-hour | ||
|- | |- | ||
|ADMIRARI multi-frequency radiometer tests | |ADMIRARI multi-frequency radiometer tests | ||
Line 110: | Line 110: | ||
|P. Garfias | |P. Garfias | ||
|University of Bonn | |University of Bonn | ||
|20-hour | |20-hour | ||
|- | |- | ||
|[http://www.engr.colostate.edu/ece/www_research/reu_chill.shtml REU] | |[http://www.engr.colostate.edu/ece/www_research/reu_chill.shtml REU] | ||
Line 116: | Line 116: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|[http://utls.tiimes.ucar.edu/science/dc3.html DC3] | |[http://utls.tiimes.ucar.edu/science/dc3.html DC3] | ||
Line 122: | Line 122: | ||
|M. Barth, W. Brune, C. Cantrell, S. Rutledge | |M. Barth, W. Brune, C. Cantrell, S. Rutledge | ||
|NCAR, PSU | |NCAR, PSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|{{ProjectsYearSep}} colspan="5" align="center"|'''2011''' | |{{ProjectsYearSep}} colspan="5" align="center"|'''2011''' | ||
Line 130: | Line 130: | ||
|J. Stith et al. | |J. Stith et al. | ||
|NCAR | |NCAR | ||
|NSF | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|DOW6 + 7 Polarimetric Data Investigations | |DOW6 + 7 Polarimetric Data Investigations | ||
Line 136: | Line 136: | ||
|J. Wurman | |J. Wurman | ||
|CSWR | |CSWR | ||
|20-hour | |20-hour | ||
|- | |- | ||
|[http://mc3e.nsstc.nasa.gov/portal/ MC3E] | |[http://mc3e.nsstc.nasa.gov/portal/ MC3E] | ||
Line 148: | Line 148: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|[http://catalog1.eol.ucar.edu/dc3_2011/ DC3 Test Flights] | |[http://catalog1.eol.ucar.edu/dc3_2011/ DC3 Test Flights] | ||
Line 154: | Line 154: | ||
|M. Barth, W. Brune | |M. Barth, W. Brune | ||
|NCAR, PSU | |NCAR, PSU | ||
|NSF | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|Heavy Rainfall | |Heavy Rainfall | ||
Line 174: | Line 174: | ||
|D. Gochis | |D. Gochis | ||
|NCAR | |NCAR | ||
|20-hour | |20-hour | ||
|- | |- | ||
|N-POL Antenna Validation | |N-POL Antenna Validation | ||
Line 180: | Line 180: | ||
|V. Chandrasekar, S. Rutledge | |V. Chandrasekar, S. Rutledge | ||
|NASA | |NASA | ||
|20-hour | |20-hour | ||
|- | |- | ||
|[http://www.engr.colostate.edu/ece/www_research/reu_chill.shtml REU] | |[http://www.engr.colostate.edu/ece/www_research/reu_chill.shtml REU] | ||
Line 186: | Line 186: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|[http://journals.ametsoc.org/doi/abs/10.1175/2010JAMC2403.1 Precipitation Echo Statistics] | |[http://journals.ametsoc.org/doi/abs/10.1175/2010JAMC2403.1 Precipitation Echo Statistics] | ||
Line 192: | Line 192: | ||
|A. R. Jameson | |A. R. Jameson | ||
|RJH Scientific, Inc. | |RJH Scientific, Inc. | ||
|NSF ( | |<div style="color:red;">NSF</div> (ATM-31996) | ||
|- | |- | ||
|{{ProjectsYearSep}} colspan="5" align="center"|'''2009''' | |{{ProjectsYearSep}} colspan="5" align="center"|'''2009''' | ||
Line 200: | Line 200: | ||
|Wen-Chau Lee | |Wen-Chau Lee | ||
|NCAR | |NCAR | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|[http://www.engr.colostate.edu/ece/www_research/reu_chill.shtml REU] | |[http://www.engr.colostate.edu/ece/www_research/reu_chill.shtml REU] | ||
Line 206: | Line 206: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|Heavy Rainfall | |Heavy Rainfall | ||
Line 218: | Line 218: | ||
|A. Houston | |A. Houston | ||
|University of Nebraska Lincoln | |University of Nebraska Lincoln | ||
| | |<div style="color:red;">NSF</div> (ATM-0715941 and others) | ||
|- | |- | ||
|Off-the-Grid X-Band Radar Tests | |Off-the-Grid X-Band Radar Tests | ||
Line 224: | Line 224: | ||
|G. A. Pablos Vega | |G. A. Pablos Vega | ||
|UPRM | |UPRM | ||
|20-hour | |20-hour | ||
|- | |- | ||
|N-POL Calibration and Validation | |N-POL Calibration and Validation | ||
Line 230: | Line 230: | ||
|V. Chandrasekar, S. Rutledge | |V. Chandrasekar, S. Rutledge | ||
|NASA | |NASA | ||
|20-hour | |20-hour | ||
|- | |- | ||
|{{ProjectsYearSep}} colspan="5" align="center"|'''2008''' | |{{ProjectsYearSep}} colspan="5" align="center"|'''2008''' | ||
Line 244: | Line 244: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|{{ProjectsYearSep}} colspan="5" align="center"|'''2007''' | |{{ProjectsYearSep}} colspan="5" align="center"|'''2007''' | ||
Line 258: | Line 258: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|{{ProjectsYearSep}} colspan="5" align="center"|'''2006''' | |{{ProjectsYearSep}} colspan="5" align="center"|'''2006''' | ||
Line 266: | Line 266: | ||
|R. Roberts | |R. Roberts | ||
|NCAR | |NCAR | ||
|NSF | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|[http://www.engr.colostate.edu/ece/www_research/reu_chill.shtml REU] | |[http://www.engr.colostate.edu/ece/www_research/reu_chill.shtml REU] | ||
Line 272: | Line 272: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|{{ProjectsYearSep}} colspan="5" align="center"|'''2005''' | |{{ProjectsYearSep}} colspan="5" align="center"|'''2005''' | ||
Line 280: | Line 280: | ||
|S. Frasier | |S. Frasier | ||
|UMASS | |UMASS | ||
|20-hour | |20-hour | ||
|- | |- | ||
|REFRACTT Demo | |REFRACTT Demo | ||
Line 292: | Line 292: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|CASA IP1 validation | |CASA IP1 validation | ||
Line 298: | Line 298: | ||
|F. Junyent | |F. Junyent | ||
|UMASS | |UMASS | ||
|20-hour | |20-hour | ||
|- | |- | ||
|FSU Seminole mobile radar tests | |FSU Seminole mobile radar tests | ||
Line 304: | Line 304: | ||
|P. Ray | |P. Ray | ||
|FSU | |FSU | ||
|20-hour | |20-hour | ||
|- | |- | ||
|{{ProjectsYearSep}} colspan="5" align="center"|'''2004''' | |{{ProjectsYearSep}} colspan="5" align="center"|'''2004''' | ||
Line 318: | Line 318: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|{{ProjectsYearSep}} colspan="5" align="center"|'''2003''' | |{{ProjectsYearSep}} colspan="5" align="center"|'''2003''' | ||
Line 332: | Line 332: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|[http://www.eol.ucar.edu/projects/t28/projects/chill-tex2003 T28] | |[http://www.eol.ucar.edu/projects/t28/projects/chill-tex2003 T28] | ||
Line 338: | Line 338: | ||
|A. Detwiler, V.N. Bringi | |A. Detwiler, V.N. Bringi | ||
|CSU | |CSU | ||
|NSF | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|{{ProjectsYearSep}} colspan="5" align="center"|'''2002''' | |{{ProjectsYearSep}} colspan="5" align="center"|'''2002''' | ||
Line 352: | Line 352: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|[http://www.eol.ucar.edu/projects/t28/projects/chill-tex2002 T28] | |[http://www.eol.ucar.edu/projects/t28/projects/chill-tex2002 T28] | ||
Line 358: | Line 358: | ||
|A. Detwiler, V. N. Bringi | |A. Detwiler, V. N. Bringi | ||
|CSU | |CSU | ||
|NSF | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|{{ProjectsYearSep}} colspan="5" align="center"|'''2001''' | |{{ProjectsYearSep}} colspan="5" align="center"|'''2001''' | ||
Line 372: | Line 372: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|Heavy Rain over Bobcat Burn Scar | |Heavy Rain over Bobcat Burn Scar | ||
Line 386: | Line 386: | ||
|M. Weisman, C. Knight, D. Macgorman, S. Rutledge, et al. | |M. Weisman, C. Knight, D. Macgorman, S. Rutledge, et al. | ||
|NCAR, OU, CSU | |NCAR, OU, CSU | ||
| | |<div style="color:red;">NSF</div> (ATM-9912562 and others) | ||
|- | |- | ||
|[http://www.engr.colostate.edu/ece/www_research/reu_chill.shtml REU] | |[http://www.engr.colostate.edu/ece/www_research/reu_chill.shtml REU] | ||
Line 392: | Line 392: | ||
|V. Chandrasekar | |V. Chandrasekar | ||
|CSU | |CSU | ||
| | |<div style="color:red;">NSF</div> | ||
|- | |- | ||
|} | |} |
Revision as of 08:11, 25 January 2014
This page lists major projects involving the use of the CSU-CHILL facility since 2000.
Project List
Name | Date | Principal Investigator | Affiliation | Type |
---|---|---|---|---|
2015 | ||||
A10 flight testing | Summer 2015 | Andy Detwiler | SDSMT | NSF |
Texas Tech mobile radar coordinated data collection | Summer 2015 | Eric Bruning | TTU | 20-hour |
2014 | ||||
FRONT PORCH VHS cross-coupling | Jul 2014 | John Hubbert | NCAR | NSF |
FRONT PORCH educational cases | Jun 2014 | Sandra Yuter | North Carolina State University | NSF |
REU 2014 | May - Jul 2014 | V. Chandrasekar | Colorado State University | NSF |
2013 | ||||
NCAR HCR Flight tests | October 2013 | S. Ellis | NCAR | 20-hour |
FRONT Rainfall and Streamflow Prediction Tests | August 2013 | R. Roberts and J. Wilson | NCAR | 20-hour |
High Park burn area runoff | 15 July - Aug 2013 | S. Matrosov | NOAA Boulder | 20-hour |
REU | May-Jul 2013 | V. Chandrasekar | CSU | NSF
|
Unmanned Aircraft System Test | June 2013 | A. Houston | University of Nebraska Lincoln | 20-hour |
CHILL Microphysical Investigation of Electrification (CHILL MIE) | June - July 2013 | B. Fuchs | CSU Atmospheric Science | 20-hour |
FROST: X-Band winter precipitation studies | Jan - April 2013 | M. Kumjian and R. Rasmussen | NCAR | 20-hour |
2012 | ||||
University of Iowa X-band radar validation | Aug - Sep 2012 | W. Krajewski | University of Iowa | 20-hour |
ADMIRARI multi-frequency radiometer tests | May - Jul 2012 | P. Garfias | University of Bonn | 20-hour |
REU | May-Jul 2012 | V. Chandrasekar | CSU | NSF
|
DC3 | May - Jun 2012 | M. Barth, W. Brune, C. Cantrell, S. Rutledge | NCAR, PSU | NSF
|
2011 | ||||
IDEAS4 | October - November 2011 | J. Stith et al. | NCAR | NSF
|
DOW6 + 7 Polarimetric Data Investigations | Jul - Aug 2011 | J. Wurman | CSWR | 20-hour |
MC3E | May 2011 | S. Rutledge | CSU | 20-hour |
REU | May-Jul 2011 | V. Chandrasekar | CSU | NSF
|
DC3 Test Flights | May 2011 | M. Barth, W. Brune | NCAR, PSU | NSF
|
Heavy Rainfall | Jun - Aug 2011 | D. Gochis | NCAR | 20-hour |
2010 | ||||
Aircraft Icing | Dec 2010 - May 2011 | J. Hubbert | NCAR | 20-hour |
Heavy Rainfall | Jun - Aug 2010 | D. Gochis | NCAR | 20-hour |
N-POL Antenna Validation | Oct-Dec 2010 | V. Chandrasekar, S. Rutledge | NASA | 20-hour |
REU | May-Jul 2010 | V. Chandrasekar | CSU | NSF
|
Precipitation Echo Statistics | Jan 2010 | A. R. Jameson | RJH Scientific, Inc. | NSF (ATM-31996)
|
2009 | ||||
ASP: Observational Instruments and Techniques | Jun 2009 | Wen-Chau Lee | NCAR | NSF
|
REU | May-Jul 2009 | V. Chandrasekar | CSU | NSF
|
Heavy Rainfall | Jun - Aug 2009 | D. Gochis | NCAR | 20-hour |
CoCoNUE | Mar - Sept.2009 | A. Houston | University of Nebraska Lincoln | NSF (ATM-0715941 and others)
|
Off-the-Grid X-Band Radar Tests | Oct - Dec. 2009 | G. A. Pablos Vega | UPRM | 20-hour |
N-POL Calibration and Validation | Nov 2008 - Jan 2009 | V. Chandrasekar, S. Rutledge | NASA | 20-hour |
2008 | ||||
Heavy Rainfall | Aug 2008 | D. Gochis | NCAR | 20-hour |
REU | May-Jul 2008 | V. Chandrasekar | CSU | NSF
|
2007 | ||||
ICE-L | Nov-Dec 2007 | A. Heymsfield | NCAR | 20-hour (ATM 0735110) |
REU | May-Jul 2007 | V. Chandrasekar | CSU | NSF
|
2006 | ||||
REFRACTT | Jun-Aug 2006 | R. Roberts | NCAR | NSF
|
REU | May-Jul 2006 | V. Chandrasekar | CSU | NSF
|
2005 | ||||
CHILL - Pawnee Bistatic tests | Jun-Aug 2005 | S. Frasier | UMASS | 20-hour |
REFRACTT Demo | Jun-Aug 2005 | R. Roberts | NCAR | 20-hour |
REU | May-Jul 2005 | V. Chandrasekar | CSU | NSF
|
CASA IP1 validation | March - May 2005 | F. Junyent | UMASS | 20-hour |
FSU Seminole mobile radar tests | March - July 2005 | P. Ray | FSU | 20-hour |
2004 | ||||
Front Range Pilot Project | May-Jul 2004 | S. Matrosov, S. Rutledge | NOAA | 20-hour |
REU | May-Jul 2004 | V. Chandrasekar | CSU | NSF
|
2003 | ||||
COMET | May-Jul 2003 | R. Cifelli | CSU | 20-hour |
REU | May-Jul 2003 | V. Chandrasekar | CSU | NSF
|
T28 | July 2003 | A. Detwiler, V.N. Bringi | CSU | NSF
|
2002 | ||||
Winter Precipitation | Jan-March 2002 | E. Brandes | CSU | 20-hour |
REU | May-Jul 2002 | V. Chandrasekar | CSU | NSF
|
T28 | June 2002 | A. Detwiler, V. N. Bringi | CSU | NSF
|
2001 | ||||
Gust Front Observations | May-Jul 2001 | B. Lee | UNC | 20-hour |
REU | May-Jul 2001 | V. Chandrasekar | CSU | NSF
|
Heavy Rain over Bobcat Burn Scar | Jun-Aug 2001 | J. Moody | USGS | 20-hour |
2000 | ||||
STEPS | May-Jul 2000 | M. Weisman, C. Knight, D. Macgorman, S. Rutledge, et al. | NCAR, OU, CSU | NSF (ATM-9912562 and others)
|
REU | May-Jul 2000 | V. Chandrasekar | CSU | NSF
|
Notes
NSF: National Science Foundation sponsored projects with deployment pool funding.
20 hr: Focused projects supported by the CHILL base funding.
Projects highlighted in green are scheduled for future operations