CSU-CHILL Projects and Deployments: Difference between revisions

From CSU-CHILL

m (Added text description)
Line 14: Line 14:
|{{FutureProjects}} |[http://utls.tiimes.ucar.edu/science/dc3.html DC3]
|{{FutureProjects}} |[http://utls.tiimes.ucar.edu/science/dc3.html DC3]
|{{FutureProjects}} |May - Jun 2012
|{{FutureProjects}} |May - Jun 2012
|{{FutureProjects}} |M. Barth, W. Brune
|{{FutureProjects}} |M. Barth, W. Brune, C. Cantrell, S. Rutledge
|{{FutureProjects}} |NCAR, PSU
|{{FutureProjects}} |NCAR, PSU
|{{FutureProjects}} |NSF
|{{FutureProjects}} |NSF (proposed)
|-
|-
|{{ProjectsYearSep}} colspan="5" align="center"|'''2011'''
|{{ProjectsYearSep}} colspan="5" align="center"|'''2011'''
Line 43: Line 43:
|NCAR, PSU
|NCAR, PSU
|NSF
|NSF
|-
|Heavy Rainfall
|Jun - Aug 2011
|D. Gochis
|NCAR
|20-hour
|-
|-
|{{ProjectsYearSep}} colspan="5" align="center"|'''2010'''
|{{ProjectsYearSep}} colspan="5" align="center"|'''2010'''
Line 49: Line 55:
|Dec 2010 - May 2011
|Dec 2010 - May 2011
|J. Hubbert
|J. Hubbert
|NCAR
|20-hour
|-
|Heavy Rainfall
|Jun - Aug 2010
|D. Gochis
|NCAR
|NCAR
|20-hour
|20-hour
|-
|-
|N-POL Antenna Validation
|N-POL Antenna Validation
|Oct-Dec 2011
|Oct-Dec 2010
|J. Gerlach, V. Chandrasekar
|V. Chandrasekar, S. Rutledge
|NASA
|NASA
|NASA
|20-hour
|-
|-
|[http://www.engr.colostate.edu/ece/www_research/reu_chill.shtml REU]
|[http://www.engr.colostate.edu/ece/www_research/reu_chill.shtml REU]
Line 83: Line 95:
|CSU
|CSU
|NSF
|NSF
|-
|Heavy Rainfall
|Jun - Aug 2009
|D. Gochis
|NCAR
|20-hour
|-
|-
|[http://tornadochaser.colorado.edu CoCoNUE]
|[http://tornadochaser.colorado.edu CoCoNUE]
Line 92: Line 110:
|N-POL Calibration and Validation
|N-POL Calibration and Validation
|Nov 2008 - Jan 2009
|Nov 2008 - Jan 2009
|J. Gerlach, V. Chandrasekar
|V. Chandrasekar, S. Rutledge
|NASA
|NASA
|NASA
|20-hour
|-
|-
|{{ProjectsYearSep}} colspan="5" align="center"|'''2008'''
|{{ProjectsYearSep}} colspan="5" align="center"|'''2008'''
|-
|-
|Flash Flood
|Heavy Rainfall
|Aug 2008
|Aug 2008
|D. Gochis
|D. Gochis

Revision as of 07:50, 20 July 2011

This page lists major projects involving the use of the CSU-CHILL facility since 2004.

Project List

Name Date Principal Investigator Affiliation Type
2012
DC3 May - Jun 2012 M. Barth, W. Brune, C. Cantrell, S. Rutledge NCAR, PSU NSF (proposed)
2011
DOW6 + 7 Polarimetric Data Investigations Jul - Aug 2011 J. Wurman CSWR 20-hour
MC3E May 2011 S. Rutledge CSU 20-hour
REU May-Jul 2011 V. Chandrasekar CSU NSF
DC3 Test Flights May 2011 M. Barth, W. Brune NCAR, PSU NSF
Heavy Rainfall Jun - Aug 2011 D. Gochis NCAR 20-hour
2010
Aircraft Icing Dec 2010 - May 2011 J. Hubbert NCAR 20-hour
Heavy Rainfall Jun - Aug 2010 D. Gochis NCAR 20-hour
N-POL Antenna Validation Oct-Dec 2010 V. Chandrasekar, S. Rutledge NASA NASA
REU May-Jul 2010 V. Chandrasekar CSU NSF
Precipitation Echo Statistics Jan 2010 A. R. Jameson RJH Scientific, Inc. NSF (ATM05-31996)
2009
ASP: Observational Instruments and Techniques Jun 2009 Wen-Chau Lee NCAR NSF
REU May-Jul 2009 V. Chandrasekar CSU NSF
Heavy Rainfall Jun - Aug 2009 D. Gochis NCAR 20-hour
CoCoNUE Mar - Sept.2009 A. Houston University of Nebraska Lincoln NSF (ATM-0715941 and others)
N-POL Calibration and Validation Nov 2008 - Jan 2009 V. Chandrasekar, S. Rutledge NASA NASA
2008
Heavy Rainfall Aug 2008 D. Gochis NCAR 20-hour
REU May-Jul 2008 V. Chandrasekar CSU NSF
2007
ICE-L Nov-Dec 2007 A. Heymsfield NCAR 20-hour (ATM 0735110)
REU May-Jul 2007 V. Chandrasekar CSU NSF
2006
REFRACTT Jun-Aug 2006 R. Roberts NCAR NSF
REU May-Jul 2006 V. Chandrasekar CSU NSF
2005
CHILL - Pawnee Bistatic tests Jun-Aug 2005 S. Frasier UMASS 20-hour
REFRACTT Demo Jun-Aug 2005 R. Roberts NCAR 20-hour
REU May-Jul 2005 V. Chandrasekar CSU NSF
2004
Front Range Pilot Project May-Jul 2004 S. Matrosov NOAA NOAA
REU May-Jul 2004 V. Chandrasekar CSU NSF

Notes

NSF: National Science Foundation sponsored projects with deployment pool funding.

20 hr: Focused projects supported by the CHILL base funding.

Projects highlighted in green are scheduled for future operations