Current Events: Difference between revisions

From CSU-CHILL

(New page: ==Current Events== The summer of 2007 is noteworthy for the CSU-CHILL Facility in that we are experiencing the culmination of years of work and planning on the new dual-offset feed antenna...)
 
No edit summary
Line 4: Line 4:
;[[July 6, 2007  Pouring a new foundation for the pedestal and radome]]
;[[July 6, 2007  Pouring a new foundation for the pedestal and radome]]
:The new radome required a larger setback from the site boundaries.  Consequently, the site was expanded to the east, and a new foundation was prepared just to the northeast of the previous radar location.
:The new radome required a larger setback from the site boundaries.  Consequently, the site was expanded to the east, and a new foundation was prepared just to the northeast of the previous radar location.
==Archives==
Older articles filed under Current Events may be viewed in the [[:Category:Current_Events|archives]]

Revision as of 13:09, 10 July 2007

Current Events

The summer of 2007 is noteworthy for the CSU-CHILL Facility in that we are experiencing the culmination of years of work and planning on the new dual-offset feed antenna. Although this started as a colaboration with Vertex/RSI to develop a new 8.5m Gregorian antenna for the radar, it expanded in scope to build a new foundation and radome to house the system. The site wiring will also be extensively updated and upgrated to a more permanent installation.

July 6, 2007 Pouring a new foundation for the pedestal and radome
The new radome required a larger setback from the site boundaries. Consequently, the site was expanded to the east, and a new foundation was prepared just to the northeast of the previous radar location.

Archives

Older articles filed under Current Events may be viewed in the archives