From CHILL
A relentless stream of ready-mix trucks kept the concrete pumper busy most of the day.
The pedestal foundation is surrounded by the 100 foot diameter radome tie-down ring.
|
Forms and reinforcement structure for the grade beam which will support the radome.
|
Concrete pump slowly fills the ring, while workers finish the central pad.
|
One of the three inflation ducts which route air from the blowers into the radome.
|
Heavily reinforced central pedestal foundation contains pedestal bolt cage.
|
Pumping crane and new construction appear to dwarf the current radome.
|
Pump operator uses a wireless remote to guide the concrete output tube into the forms.
|
Top of radome ring is finished by hand while the level is check by a laser detector.
|
Laser leveler (in foreground) provides a height reference for finishing the concrete.
|