File:CH 15.png

From CSU-CHILL

Original file(1,000 × 661 pixels, file size: 1.03 MB, MIME type: image/png)

The CSU-CHILL FPS-18 van receives a second transmitter on 20 October 1994. This transmitter cabinet had been obtained earlier in the year as surplus equipment from NSSL. This second transmitter would be connected through a dual-channel rotary waveguide joint to the V polarization port of the new antenna. The dual transmitter configuration eliminated the need for the Raytheon polarization switch. The resultant improvement in isolation between the H and V channels extended the measurement of Linear Depolarization Ratio (LDR) down to the new antenna’s measurement limit (~ -34 dB). From left to right in the photograph, Ken Pattison (wearing a hat), and Dave Brunkow monitor the clearances as Gene Mueller operates the forklift.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current04:36, 9 August 2020Thumbnail for version as of 04:36, 9 August 20201,000 × 661 (1.03 MB)Pat kennedy (talk | contribs)

The following page uses this file: